Completed Projects

NEWLANDS PRIMARY SCHOOL RAMSGATE KENT – NEW DINING HALL AND KITCHEN

Project Value £ 650,000.00
Project Manager: HMY Architects – Mr Stephen Coomber
Client: KCC – Mr.Richard Burge
Project Commenced          1/10/2010 
Project Completion Date    30/6/2011
BEC SITE MANAGER: Mr Andy Louch

A new detached extension to provide dining Hall, W.C’s, and kitchen to serve the existing primary school.
Project consists of traditional foundations, with a PCC ground floor, steel frame, with loadbearing face brickwork, Glulam Beams, with a pitched and tiled roof over.
Cedar cladding to the Gable ends, with external render panels, and internally, a complete new Kitchen fit out, with a Junckers floor, and soft finishes.
Externally new ramps for disabled access and a covered walkway complete the project.

<

 
 

Newlands Primary School

Newlands Primary School

MAIDSTONE GRAMMAR SCHOOL FOR BOYS – NEW FOOD TECHNOLOGY BLOCK AND SIXTH FORM CENTRE

A DESIGN AND BUILD CONTRACT BY BEC CONSTRUCTION LIMITED

Project Value £ 650,000.00
Project Architect: CDP Architects    
Client: Maidstone Grammar School – Heather Cook
Project Commenced          10/10/2010  
Project Completion Date    03/07/2011

BEC SITE MANAGER: Mr John Verrier.

New Purpose built Food Technology Block and Sixth Form centre consisting of traditional foundations facing brick walls with Trespa rainscreen cladding to the first floor, handmade tiled roof.
Internally includes full food technology fit out and teaching area including interactive work boards, and a new sixth form area, with a fitted out Café, and disabled lift.
Externally a new access road to be installed and associated external works and Car Parking.

 
 

Maidstone Grammar School

Maidstone Grammar School

C.A.T.S COLLEGE NEW STUDENT HOUSING, 56-60 NEW DOVER ROAD, CANTERBURY, KENT

Project Value £ 1,300,000.00
Project Architect: Clague Architects – Pat Mills    
Client: C.A.T.S College – Mr Sherif Elmaourki
QS Betteridge & Milsom
Project Commenced             10/01/2011  
Project Completion Date    5/09/2011
BEC SITE MANAGER: Mr Doug Woodcock.

New Timber framed Building to provide 40 No new student accommodation units. Construction consists of traditional foundations, PCC floor, Kingspan timber frame, preformed bathroom Pods, a traditional pitched roof to one building and a Single Ply roof to the main block. External faced brickwork, with brick arches, Aluminium windows, with extensive external works. Scheme constructed to Breeam Very Good, and under the CCS scheme.

 
 

CATS Student housing

WESTGATE DOCTORS SURGERY,6 NO NEW CONSULTING ROOMS AND INTERNAL REFURBISHMENT, WESTGATE BAY AVENUE WESTGATE ON SEA, KENT

Project Value £ 350,000.00
Project Architect: Duncan and Graham – Simon Friend 
Client: Westgate Surgery 

Project Commenced 16/01/2012
Project Completion Date 28/09/2012 

BEC SITE MANAGER: Mr Andy Louch 

Traditionally constructed Facing Brick Extension, Eco Joist roof, Single Ply Roof Finish, with Wood Effect UPVC windows. Internally 6 No treatment and consulting rooms. Exisitng Surgery refurbished with new Reception, front entrance, and extensive external works Foundations and oversight.

  
  C.A.T.S College
  

C.A.T.S COLLEGE NEW INFILL TEACHING BLOCK, 56-60 NEW DOVER ROAD, CANTERBURY, KENT

Project Value £ 700,000.00
Project Architect: Clague Architects – Pat Mills
Client: C.A.T.S College – Mr Sherif Elmaourki 
QS Betteridge & Milsom 

Project Commenced 16/01/2012
Project Completion Date 31/08/2012 

BEC SITE MANAGER: Mr Doug Woodcock.

New Timber framed Building to provide 6 No new Classrooms. Construction consists of traditional foundations, PCC floor, Kingspan timber frame, and underfloor heating, and Single Ply roof to the main block. External faced brickwork, with brick arches, Aluminium windows, with extensive external works. Scheme constructed to Breeam Very Good, and under the CCS scheme.

C.A.T.S College   C.A.T.S College

C.A.T.S College  C.A.T.S College 

BAY POINT GYM, EXTENSION, SANDWICH KENT

Project Value £ 200,000.00

Project Architect: URBAN SURVEYING

Client: BAY POINT GYM

Project Commenced 16/06/2012 
Project Completion Date 28/09/2012

BEC SITE MANAGER: Mr JOHN VERRIER

Traditionally constructed, facing brick extension, metal fabricated trusses, composite insulated roof finishes, with aluminium windows.

Internally, new flooring, and fit out for new gymnasium.