Completed Projects

THE MEADS DOCTORS SURGERY – NEW DOCTORS SURGERY FIT OUT FOR WAREMOSS LTD

Project Value:  £745,000.00
Project Architect: Duncan and Graham Partnership.
Client: Waremoss ltd.

Project Commenced MAY 2014
Project Completion Date 23/1/2015 – HANDED OVER ON TIME

BEC SITE MANAGER: Mr Stephen Hoare

Complete fit out to form a new Doctors Surgery constructed to achieve Breeam excellent.

Fit out consisted, of a complete M and E design, with underfloor heating, ventilation system, Doctors Waiting system, Induction loop, new lighting, and automatic entrance doors. Internally the finish was very high specification, with Ash doors, and glazed screens, an Ash reception desk, acoustic flooring, and internal doors, a Records store, 6 Consulting rooms, two treatment rooms, waiting areas, sluice room, kitchen, reception area, and office area for the admin staff, all with furniture fit out

COMPLETED RECEPTION AREA
 
meads 1
   
TREATMENT ROOM CONSULTING ROOM
   
meads treatment room meads consulting room
   
STAFF KITCHEN                 RECORDS STORE
   
meads kitchen meads records
   
CONFERENCE ROOM ADMIN AREA
   
meads conference meads admin
   
BEC OBTAINED BREEAM EXCELLENT ON THIS PROJECT
   
meads cert
   

JOY LANE PRIMARY SCHOOL – NEW TWO CLASSROOM EXTENSION FOR KCC

Project Value:  £565,000.00
Project Architect: DASL
Client: KCC

Project Commenced JAN/2014
Project Completion Date 5/9/2014 – HANDED OVER ON TIME

BEC SITE MANAGER: Mr ANDY LOUCH

Traditionally constructed extension building to provide additional classrooms, wc’s, and Office and Reception Area.

The project consisted of a New Car Park, and new Single Storey Building, constructed from traditional foundations, part load bearing blockwork, and steel frame, load bearing ground floors, pcc gf, with external render and timber roof. Finishes were single ply flat roof, external through coloured render, with new aluminium doors, and windows.

 
Joy lane 1
 

NEW  TWO CLASSROOM BLOCK

 
jpy lane 2

NEW SIXTH FORM BLOCK AT HARTSDOWN TECHNOLOGY SCHOOL, MARGATE ,KENT

Project Value:  £1,150,000.00
Project Architect: DASL
Client: HARTSDWON TECHNOLOGY SCHOOL

Project Commenced 01/10/2013
Project Completion Date 01/08/2014 – HANDED OVER THREE WEEKS EARLY

BEC SITE MANAGER: Mr GLENN PARKER

Traditionally constructed stand alone Building to provide additional classrooms, wc’s, and Sixth form common area.

The project consisted of a New Car Park, and new two Storey Buidling, constructed from traditional foundations, part load bearing blockwork, and steel frame, load bearing ground floors, insitu ff, with first floor timber frame and timber roof. Finishes were single ply flat roof, external through coloured render, and trespa cladding externally, with new aluminium doors, and windows.

GROUND SLAB & STEELS   GF BLOCKWORK AND FF STEELS
   
Hartsdaown ground slab Hartsdown GF Blockwork
   
TIMBER FRAME                                              EXTERNAL RENDER
 
Hartsdown timber frame Hartsdown external render
   

READY FOR HANDOVER – THREE WEEKS EARLY 

 
Hartsdown completed
   
   
Hartsdown completed 2

   

  

 

MARLOWE INNOVATION CENTRE EXTENSION, MARLOWE WAY RAMSGATE KENT, KENT

Project Value:  £950,000.00
Project Architect: GPM2
Client: FRIENDS OF THE FOLKESTONE AND MARLOWE ACADEMIES

Project Commenced 01/08/2013
Project Completion Date 28/3/2014 – HANDED OVER TWO WEEKS EARLY

BEC SITE MANAGER: Mr JOHN VERRIER

Traditionally constructed Extension to the existing building to provide additional workplaces to the Innovation Centre.

The project consisted of a New Car Park, and new two Storey extension, constructed from traditional foundations, part load bearing blockwork, and steel frame, pcc ground and first floors, with timber roof. Finishes were single ply flat roof, external through coloured render, and trespa cladding externally, with new aluminium doors, and windows

.

FOUNDATIONS GF PCC FLOORS
   
Marlowe foundations Marlowe GF PCC
   
GROUND FLOOR & PCC FLOORS                  BLOCKWORK AND ROOF COMPLETE
   
Marlowe Ground floor Marlowe Blockwork
   

COMPLETED READY FOR HANDOVER – TWO WEEKS EARLY

 
Marlowe completed 1 Marlowe completed 2
   
   
   
Marlowe completed 3

   

  

 

 

BROADWATER DOWN PRIMARY SCHOOL

Project Value:  £300,000.00
Project Architect: 
Client: KCC

Project Commenced 06/07/2015
Project Completion Date 28/08/2015

BEC SITE MANAGER: 

New modular classroom and associated external works.

 
image008
 

 

 
 

JOY LANE PRIMARY SCHOOL 

Project Value:  £110,000.00
Project Architect: 
Client: KCC

Project Commenced 15/06/2015
Project Completion Date 21/08/2015

BEC SITE MANAGER: 

Infill to existing courtyard to create a new classroom

 
Joy lane 1