Completed Projects

6 ST DUNSTANS TERRACE 

Project Value:  £620,000.00
Project Architect:  CDP/BSF ENGINEERS
Client: Private Client

Project Commenced 01/01/2015
Project Completion Date 30/03/2016

BEC SITE MANAGER:  Mr Doug Woodcock

Extension to provide new basement kitchen, bathroom and living space. Including new garage and complete refurbishment of existing listed building.

   
st dunstans89  st dunstans91
   
 st dunstans93  st dunstans94
   
st dunstans97 st dunstans99
   
6 St Dunstans 6 St Dunstans1
   
6 St Dunstans2 6 St Dunstans3
   
6 St Dunstans4 6 St Dunstans5
   
6 St Dunstans6 6 St Dunstans7

Knockhall Primary School 

Project Value:  £2,200,000.00
Project Architect:  AECOM
Client: Kent County Council

Project Commenced 01/07/2015
Project Completion Date 30/09/2016

BEC SITE MANAGER:  Mr Andy Louch

The project consisted of two phases.

Phase one consisted of a new car park, new dining hall with purpose made steel plan kitchen.

The second phase consisted of the demolition of the existing hall, and then a new steel frame six classroom teaching block, constructed of new strip foundations, steel frame PCC floors, external face brickwork, flat roof with single PLY. Externally we provided a new car park, road adaptions, a new artifical grass playing area and associated external works.

   
 knockhall77 knockhall79 
   
 knockhall81 knockhall82 
   
knockhall85 knockhall87
   
 knockhall  knockhall1
   
knockhall2 knockhall3
   
knockhall4 knockhall6
   
knockhall7 knockhall8
   
knockhall9 knockhall10
   

 

 

Maidstone Grammer School - Phase one of two performing arts block

Project Value:  £2,935,942.00
Project Architect:  CDP
PQS: MODUS
Client: Maidstone Grammer School

Project Commenced 30/01/2017
Project Completion Date 18/08/2017

Phase one consisted of the demolition of the existing Music and Performing Arts block and construction of a new one in its footprint.

It was a traditional build, comprising of a beam and block floor and brickwork façade.

The new facility provides state of the art music classrooms, drama and performance spaces as well as sound-proof practice rooms.

   
 maidstone maidstone1
   
maidstone2  maidstone3
   

St Andrews Vicarage

Project Value:  £398,327.66
Project Architect:  Diocesan Architecture

Project Commenced 26/09/2016
Project Completion Date 31/05/2017

BEC SITE MANAGER:  Andy Louch

The construction of a 4 bedroom Vicarage, Raft foundation, block and beam floor, external facing brickwork and render with triple glazed windows and slate roof with landscaped grounds.

The project has almost now to a close, after completing the additional external works and a car park.

   
St andrews St andrews1
   
St andrews2  
   

Canterbury Academy

Project Value:  £2,865,406.91
Project Architect:  OSG Architecture
Client: Canterbury Academy

Project Commenced 25/07/2016
Project Completion Date 04/09/2017

BEC SITE MANAGER:  Glenn Parker

New build 12 Classroom Teaching Block, refurbishment of 2 science labs, and new external car park and landscaping.

We have completed construction of the project the internal finishes and successfully handed this project over on time.

This project which we worked alongside Modus QS and OSG architects is being nominated for the south east category for Best Education build and Best Partnership.

   
 canterbury academy canterbury academy2 1
   
 canterbury academy1 1  canterbury academy3 1
   

Otford Church

Project Value:  £848,389.42
Project Architect:  Clague Architects
Client: Otford Methodist Church

Project Commenced July 2016
Project Completion Date April 2017

BEC SITE MANAGER:  Steve Hoare

BEC began works to the Otford Church, to erect a new church extension to the existing Church Hall.

The main construction consists of traditional foundations, precast flooring, and a steel frame. The roof finishes include a beautiful pitched roof, complete with zinc roofing, clay tiles, and several large panels of roof glazing, which can be opened internally.

External finishes will be facing brickwork and panels of render to finish the façades. Also include within the external walls are several window panelled areas with a specially procured stain glass window to the front elevation. This amazing piece of stainless work will put the finishing touches which we feel fully completes the design.

Internally the works include a new purpose built baptistery pool, featured on an elevated timber stage, finished with oak communion rail, designed with the exact requirements of the church, including stainless steel posts and holes to receive communion glasses. Electrically we installed a complete new Sound and Audio system throughout the extension, which can be manned from a single purpose built AV desk.

To finish the project of we’ve laid a new tarmac car park, with dedicated spaces for disabled parking and a cycle stand.

   
 otford otford1
   
otford2  otford3